The subject of the project of automation and EMD for the sports hall in Njeguši includes the management of the heating system and the ventilation system in case of fire. The predicted solution for the heating system is based on the use of a PLC device that controls the operation of the pump by monitoring the temperature in the system. In case of fire the ventilation system is also controlled via a PLC device when a fire signal is received from the PP control panel.
One of the most modern solution has been designed for this type of facility that offers energy efficiency and reliable system operation.