The subject of the project is automation and EMD design for the Event hall with an above-ground garage and kitchen within the Main Building.
The control system of the electric motor drive is designed to provide the possibility of control and automatic regulation within the building over the systems of thermotechnics (ventilation and air conditioning systems and preparation of domestic hot water for the kitchen).
The designed solution, depending on the type of system is based on the use of PLC devices that control the operation of pumps, fans, etc.
Touch panels have also been designed from which the user will be able to monitor the operation of air handling units, as well as manage them.