Date:

July, 2016

Type of work:

Commissioning / Industry

Client:

J.P. “VODOVOD I KANALIZACIJA ” Cetinje

Location:

Cetinje, Montenegro

Reconstruction of the pumping station management system as well as automation for the management of water supply pumps in the Roma settlement, Cetinje

Reconstruction of the control cabinet and control system of the pumping station Uganjska Vrela, Cetinje was made. The existing power supply control cabinet for water supply and control of water pumps has been reconstructed. In the first phase, it was realized with the starting of the star-triangle pumps, and in the second phase, frequency regulators were installed.

In addition, the cabinets of automation and hydrophore plant were built and integrated into the existing SCADA system for water supply of the Roma settlement, as well as the installation of pumps and systems for measuring the level of the reservoir at the Lašor station.