The subject of the project is BMS and EMD for the parking garage ventilation system.
The designed automation enables monitoring of the concentration of CO or eventual occurrence of fire and according to that it switches on the ventilation in the appropriate mode of operation.
The project also provides occasional ventilation of the garage according to a certain algorithm, based on the use of PLC devices.
The main PLC device built into the cabinet of automation is connected to the SCADA system of the hotel and in this way it will be possible to monitor the ventilation system of the garage from the central computer.